Incident Detail: 2011 Call No. 056


2011
Call No.  56
Time Out
07/05/2011
23:17
Time In
07/06/2011
02:08
Type
 Structure Fire 
Location
 259 Park Lane 


No Photo Available for This Incident

July 5, 2011

Company 21, Engine 23, and Truck 22 dispatched class one to 259 Park Lane in Washington Township for a reported fully involved trailer fire with a burn victim. Truck 22 responded with 7 and Chief 22 POV. Engine 23 arrived on side A just ahead of Engine 21, which took side C. Medic 6 on scene reported a burn victim and that it was a result of a domestic. Truck 22 arrived and beached the rig on a lower road and sent their crew to side C, where they assisted Engine 21 with fire suppression. Crews from Engine 23 and Rescue 21 attacked the fire from side A. Command requested additional tankers, and tankers from Gratz and Wiconisco were dispatched, along with Engine 22 for the fill site at the camp grounds outside of Loyalton. Engine 22 responded light with 2 and requested an additional Engine for manpower, and Engine 27 was dispatched to assist them. They established a fill site and laid 300 feet of 5 inch out to Route 209. The trailer was fully involved upon arrival of initial companies, and suppression efforts were done by crews from 21, 22, and 23. Company 20 was placed on standby in quarters for Company 21, and Company 24 stood by in quarters for Companies 22 and 23. After control, crews assisted with salvage and overhaul and the arrival of PSP and the fire marshal. After completion of those tasks, command placed the Engine and Truck available.



 Copyright © 2004 -2020  Liberty Hose Company No. 2.   All rights reserved.  |  Legal  |  About Our Site  |